Tag: Power cut carried out on 03 February by CEB could have been avoided: PUCSL
Power cut carried out on 03 February by CEB could have been avoided: PUCSL
Feb 27, 2020 (LBO) – Public Utilities Commission of Sri Lanka (PUCSL) says that the load shedding programme carried out on 03 February 2020 could have been avoided. “Apparently the system had enough capacity to supply the full demand during the period of load shedding,” the PUCSL said in an analysis report. “However, if the […]
